Case Study
Etihad Rail Project _Phase 2
United Arab Emirates
Railways etched a significant mark in history, standing out as one of the most sustainable, efficient, and safe modes of transportation. In the GCC, the past rejuvenation of rail infrastructure symbolised unparalleled progress, technology, and sustainability. The UAE’s vision materialised prominently through the ambitious Etihad Rail project, which not only connected the main emirates but also became an essential segment of the $100bn GCC rail programme. We partnered with Hadeed Steel Industries and worked for esteemed companies such as China State Construction Engineering Corporation Ltd., China Railway Construction Corporation (CRCC), and Ghantoot Transport & General Contracting Company, diving deep into the project’s complexities.
ES Calculations took immense pride in our significant contributions to this transformative endeavour. We executed state-of-the-art ground improvement techniques, crafted specialized foundation solutions tailored to the region’s unique geology, and rigorously analysed settlements for enduring stability. In this intricate tapestry, we executed the construction of approximately 60 gantries using pioneering formwork/falsework techniques and shielded the railway’s utilities with protective slabs and additional gantries. Through unwavering dedication and innovation, both Hadeed Steel Industries. and ES Calculations played pivotal roles in sculpting a project that stands as a testament to engineering excellence and a future-driven mindset.
Feature Case Studies.
Santa Catalina #8 Madrid. Spain
Finished.
Completion Date: June 2020
Clark Freeport Zone.
Pampanga, Philippines.
Under Construction. Estimated Completion – June 2024
Ara Tūhono – Pūhoi – Warkworth. Auckland. NZ
Finished.
Completion Date: June 2023
From initial ideas to final realization, we’re with you at every step. Your vision, our expertise – a perfect synergy.
our core team.
Contact us